Trusted F5 to A10 Networks Migrations, Fixed Scope
To migrate F5 BIG-IP to A10 Networks Thunder ADC, we translate your iRules into aFleX scripts and map LTM/GTM settings to A10 SLB/GSLB. Senior engineers. Fixed scope. No surprise costs.
The lowest-cost way off F5 BIG-IP: our migration tooling automates the repetitive work —you pay senior engineers for judgment, not keystrokes.
How we support F5 BIG-IP → A10 Networks Thunder ADC after migration
- ✓Senior engineers rewrite iRules to aFleX scripts.
- ✓We match your LTM and GTM settings exactly.
- ✓Fixed scope means no surprise costs or delays.
- ✓Your legacy F5 cluster stays supported during move.
- ✓Full cutover validation before you go live.
- ✓Post-migration A10 ops and support available.
Escalating F5 hardware maintenance costs
Forced hardware upgrades every few years — but you don't need new F5 iron just because the vendor says so. Move to A10 Thunder ADC and run on your terms.
M&A platform harmonization deadlock
Mergers often demand one load-balancing platform. If you're consolidating onto A10, we'll get the F5 estate converted without bleeding engineers on both sides.
Fear of losing proprietary F5 configurations
Those complex iRules, GTM topologies, and security policies feel locked in. They're not. We've rewritten thousands of lines of iRules and replicated advanced GTM setups onto A10 aFleX and GSLB.
F5 BIG-IP → A10 Networks Thunder ADC migration — your questions answered
What about complex F5 APM or ASM policies? Can those migrate?+
Some F5 APM workflows and ASM rule structures are deeply proprietary. Our team disassembles those configurations and reimplements them natively in A10 aFleX and A10's security engine — no shortcuts. This is exactly the kind of heavy lifting we handle, and it's why we include it in our fixed-scope projects.
How do you convert F5 LTM/GTM settings and iRules to A10?+
Yes. We take your existing LTM virtual servers, pools, monitors, and profiles and map them directly to A10 SLB (Server Load Balancing) configuration. We also translate GTM/F5 DNS settings to A10's GSLB. iRules are rewritten line by line into aFleX scripts, tested against your traffic.
Do I have to cut over all at once? Can I keep F5 support during migration?+
Yes. You keep paying F5 for support as long as your F5 hardware is under contract. That gives you a safety net. If your contract lapses, our third-party support covers most operational issues on the legacy BIG-IP cluster while you complete the migration. There is no force to cut over until you're ready.
What's the actual timeline and cost for an F5 to A10 migration?+
We run a structured, fixed-scope project. First, we audit your current F5 configuration (LTM, GTM, iRules, APM, ASM). Second, we build the A10 environment with translated configs. Third, we validate traffic flows and failovers. Fourth, you cut over. Typical projects run 2–4 months with two senior engineers. Budgets range from $35,000 to $230,000 depending on complexity.
Move Your Workloads. Keep Your Sanity.
Ready to cut F5 costs without cutting corners? Our team has migrated dozens of F5 BIG-IP to A10 Thunder ADC environments — including complex APM, ASM, and GTM configurations. After migration, keep your new A10 ADC running smoothly with our A10 Networks Thunder ADC Operations & Support Services. Get a written scope, timeline, and price. Start with an F5 to A10 Configuration Migration Audit.