3P
3rd Party Support
IBM · IBM QRadar → Datadog Cloud SIEM · Migration

Proven QRadar to Datadog Migration – Trust Our Engineers

Yes, migrating from IBM QRadar to Datadog Cloud SIEM is a well‑understood project. Our senior engineers keep QRadar live during the move, then hand you a clean, consolidated security monitoring environment.

Get My Free AssessmentFixed scope. Senior engineers. No security gaps.

Get My Free Assessment

Fixed scope. Senior engineers. No security gaps.

Your quote will be sent to this address.

By submitting this form, you agree to our Privacy Policy.

Powered by the 3PS Migration Engine

The lowest-cost way off IBM QRadar: our migration tooling automates the repetitive work —you pay senior engineers for judgment, not keystrokes.

Automated discovery
Your IBM QRadar estate mapped — workloads, dependencies, licensing — before day one
Conversion tooling
Schema, config and workload translation to Datadog Cloud SIEM, automated where it's safe
Parity validation
Side-by-side testing proves Datadog Cloud SIEM matches production before cutover
Runbook cutover
Rehearsed, reversible, scheduled in your maintenance window
3–6 months
Typical project timeline
2
Senior security engineers per project
40–70%
Savings on legacy platform support while you migrate

How we support IBM QRadar → Datadog Cloud SIEM after migration

  • Fixed‑scope project with 2 senior security engineers.
  • QRadar stays active – no forced cutover, no risk.
  • Centralise security logs, metrics, and traces in Datadog.
  • Eliminate costly QRadar Collector appliance maintenance.
  • 40–70% savings on legacy platform support while you migrate.
  • 24/7 US‑based support throughout the 3‑6 month timeline.

Cloud‑native architecture is forcing a SIEM change

You are migrating to Cloud‑native Kubernetes and microservice architectures, but QRadar was built for on‑premises log silos. Centralising security logs with your existing monitoring and APM toolsets is becoming urgent.

High maintenance costs of QRadar appliance fleet

QRadar Collector appliances carry high maintenance overhead and licensing costs. Your team spends time racking gear instead of writing detection rules.

Syslog networks without a reliable Cloud gateway

Legacy on‑premises raw database log collection and traditional syslog networks make it hard to reliably route data to a Cloud gateway. You worry about lost logs during migration.

IBM QRadar → Datadog Cloud SIEM migration — your questions answered

Will we have a security coverage gap during migration?+

During the project we maintain your existing QRadar environment under vendor support (your active contract remains in place). You can run both platforms in parallel and cut over on your schedule. If your vendor renewal lapses, our third‑party support covers most operational issues on QRadar while you finalize the move (this is not vendor support and does not include vendor patches).

How long does a QRadar to Datadog SIEM migration take?+

3–6 months on average, staffed by two senior platform engineers. Scope is fixed upfront so you know the timeline and budget before we start.

What is the typical budget for this migration?+

$45,000–$210,000 depending on environment complexity (number of log sources, data volume, integration requirements). Fixed scope means no surprise overruns.

Our log collection relies on on‑premises raw databases and syslog – is that a blocker?+

Not at all. Our engineers handle both legacy syslog networks and Cloud gateway connections. We map your existing log flows, build reliable Cloud ingestion, and test every pipeline before switching over.

Post‑Migration: Managed Datadog SecOps & Rule Engineering

Our managed Datadog Security Operations and Rule Engineering keeps your new SIEM tuned. Setup blueprint and log mapping assessment included with every project.

Get a Quote

Your quote will be sent to this address.

By submitting this form, you agree to our Privacy Policy.