Intel Processors Ivy Bridge (Xeon E5v2/E7v2)
Intel Processors Ivy Bridge (Xeon E5v2/E7v2)
The Intel Processors Ivy Bridge (Xeon E5v2/E7v2) reached end of service life on Jun 30, 2020. Third-party maintenance keeps it supported — 24/7 engineering support and same-day replacement parts — at 40-70% below OEM renewal pricing.
Specifications
- product
- intel-processors
- release
- ivy-bridge-xeon
- product Label
- Intel Processors
- release Label
- Ivy Bridge (Xeon E5v2/E7v2)
- codename
- lts
- latest Version
- release Date
- 2012-04-29
- maintained
- source Url
- https://endoflife.date/intel-processors
Lifecycle Dates
- End of Sale
- Jun 5, 2015
- End of Service Life
- Jun 30, 2020
- Last OEM Support
- Jun 30, 2020
OEM vs. 3rd Party Support
See how 3rd party maintenance compares to traditional OEM support for your Intel Processors Ivy Bridge (Xeon E5v2/E7v2). Get the same level of service at a fraction of the cost.
| Feature | OEM Support | 3rd Party Support |
|---|---|---|
| Post-EOSL Support | ||
| 24/7/365 Support | ||
| Same-Day Parts Replacement | Limited | |
| Mixed-Vendor Support | ||
| Flexible Contract Terms | Annual Only | Month-to-Month Available |
| Asset Lifecycle Extension | ||
| OEM-Trained Engineers |
Why Choose 3rd Party Support for Intel Processors Ivy Bridge (Xeon E5v2/E7v2)?
Save 40-70%
Dramatically reduce your maintenance costs while maintaining the same level of support coverage.
Extend Asset Life
Continue using your Intel Processors Ivy Bridge (Xeon E5v2/E7v2) well beyond the OEM end-of-life date.
24/7 Expert Support
OEM-trained engineers available around the clock with same-day parts replacement.
Intel Processors Ivy Bridge (Xeon E5v2/E7v2) Support: Frequently Asked Questions
Is the Intel Processors Ivy Bridge (Xeon E5v2/E7v2) still supported?
Intel Processors ended support for the Intel Processors Ivy Bridge (Xeon E5v2/E7v2) on Jun 30, 2020. Third-party maintenance remains available and keeps the Intel Processors Ivy Bridge (Xeon E5v2/E7v2) supported with 24/7 engineering support and same-day replacement parts.
When is the Intel Processors Ivy Bridge (Xeon E5v2/E7v2) end of service life (EOSL) date?
Intel Processors lists the end of service life for the Intel Processors Ivy Bridge (Xeon E5v2/E7v2) as Jun 30, 2020. End of sale was Jun 5, 2015.
Can I keep using the Intel Processors Ivy Bridge (Xeon E5v2/E7v2) after its EOSL date?
Yes. EOSL means Intel Processors stops selling support contracts and issuing updates — the equipment itself keeps working. Third-party maintenance provides engineering support and replacement parts for as long as you choose to run it.
How much does third-party support for the Intel Processors Ivy Bridge (Xeon E5v2/E7v2) cost?
Typically 40-70% below the OEM maintenance renewal price. Exact pricing depends on quantity, service level and location — request a quote and we respond within 24 hours.